REMOTE LOCATION EVACUATION DIAGRAM

This diagram was produced for a large 3000 bed multi-site mining village. The remote camp required that we were fully ticketed and trained for Queensland mining sites. We have the resources to implement our clients requirements.

When the going gets tough, SAFEJOB gets going. There were many challenges to overcome in producing such a large quantity of diagrams (4500 diagrams) over a diverse range of building that were geographically separated and in remote locations. SAFEJOB rose to the challenge and completed the job within a month.

Updated: 14th June 2022
5.0